Site manager

Giu*** ***** (XX Anni)
Technical Field Advisor a MACCHI Spa. Sofinter Group On Behalf of Linde Company
Ist.Tecnico R.Lambruschini
Mentana,
Lazio
Questo candidato e' disposto a spostare
|
Esperienza
Technical Field Advisor
MACCHI Spa. Sofinter Group On Behalf of Linde Company
ott 2020 - ago 2021
Project: CWHRB Replacement EPC Phase- Olefin 1 
Erection works for installation of a MRD Boiler 
-	Coordinate and direct construction workers and subcontractors on site
-	Meet contractual conditions of performance till Mechanical completion
-	Review the construction work progress on daily basis
-	Prepare internal and external reports pertaining to job status
-	Ensure quality construction standards and the use of proper construction techniques
Technical Field Advisor
MACCHI Spa. Sofinter Group on behalf of Saipem/British Petroleum
apr 2019 - giu 2020
Project: TEP-TANGGUH EXPANSION PROJECT
Erection works for installation of a HRSG boiler 
-	Coordinate and direct construction workers and subcontractors on site
-	Meet contractual conditions of performance
-	Review the construction work progress on daily basis
-	Prepare internal and external reports pertaining to job status
-	Ensure quality construction standards and the use of proper construction techniques
Site Manager
Spig for GE–Orascom new Assyut combined cycle
mar 2017 - nov 2018
Project: Conversion of the existing 1000 MW Power Plant from simple to combined cycle with additional capacity of 500 MW  
-	Overseeing and directing construction projects from conception to completion
-	Reviewing the project in-depth to schedule deliverables and estimate costs
-	Overseeing all onsite constructions to monitor compliance with building and safety regulations
Site Construction Manager
Nooter Eriksen On Behalf of Samsung
feb 2016 - dic 2016
Project: Umm Al Houl Power Plant - erection works for installation of a HRSG boiler 
-	Coordinate and direct construction workers and subcontractors on site
-	Meet contractual conditions of performance
-	Review the construction work progress on daily basis
-	Prepare internal and external reports pertaining to job status
-	Ensure quality construction standards and the use of proper construction techniques
Site Manager and Construction Manager
Ansaldo Energia
apr 2009 - dic 2015
EPC Projects followed:
	Realization a Power Plant Turbine a Gaz about 3x140.5 MW in Labreg district of Khenchela (Algerie) on behalf of Sonelgaz -CEEG-SPE, Representative of the Algerian Government
	Realization a Power Plant Turbine a Gaz about 2 x131.95 MW in Batna Ain Djasser II on behalf of Sonelgaz-CEEG-SPE. Representative of the Algerian Government
	Realization a Power Plant a Combined Cycle about 750 MW in Alexandria- Egypt, denominated -Sidi Krir Power Station -on behalf of- West DELTA Electricity Production Company. Representative by Egypt Government
	Realization a Power Plant a Gas Turbine De Larbaa about 4 x139 Mw in Alger, On behalf of Sonelgaz CEEG-SPE Representative of the Algerian Government
	Realization a Power Plant a Combined Cycle about 450 MW in San Severo (FG) Italy on behalf of the Company (EnPlus/Alpiq)

-	Plan, organize, and direct activities concerned with the construction works
-	Oversee subcontractors and vendors to ensure quality standards are met
-	Inspect and review work progress to monitor compliance with building and safety codes and other regulations
-	Ensure safety guidelines are followed on all job sites
-	Confer with supervisory personnel, clients, suppliers, and engineering professionals to discuss and resolve matters such as work procedures, complaints, and construction problems discuss and resolve matters such as work procedures, complaints, and construction problems
Site Manager
DEME Group
mar 2007 - dic 2008
MEDGAZ -Project Marine Pipeline EPIC Contract: design and realization of two Causeways, preparation of the seabed for the laying of pipes from 24" subsequent back filling and Pipes Pull-In in the Mediterranean Sea, and upon completing, the junction with the pumping station located in Beni Saf.
Arrangements of final works on the beach of Sidi-Djelloul, to allow two-gas pipeline from South Algeria (Hassi R'Mel) and to be laid by Saipem's Castoro Sei Laybarge, for a length of 210 km between Beni Saf and the Reception Terminal in Almeria (Spain).

Rehabilitation and extension of existing Runway Assedrem Airport: rehabilitation and extension of existing Runway Assedrem Airport in Mali from original length of 900 meters to a total of 1,600 km interlocked to new AGIP fields of exploration of Taoudeni (West Sahara) and construction of new maintenance hangar, assets and the stationing of the HVAC plane.
Assistant superintend
SAIPEM SPA
apr 2004 - feb 2007
On behalf of ENI as listed below.          
	Installation of n°3 oil Platform, Ikalou, Ikalou South and Awapalouko on the Loango field Congo); on behalf of AGIP Spa. 
	Realization of one Plem in Adriatic Sea for protection valve to joint Platform katarina and Regina 
	Realization of one-off oil Pipeline 20” for overall length 17.5 Km between Platforms Booster 36 and Morgan water Onshore Plant Flood on behalf of G.U.P.C.O Egypt.
	Construction of a Deck Arck and a Shut in the base ERSAI of Amsterdam (NL) and the following laying in work of an Umbilical cable Trasmission, overall length KM. 50 to position in the field Rosa in Congo with the Saipem 3000 laybarge.
	Construction of a complete Platform (Module and Jacket) in the Base ERSAI of Schiedam (NL) and following laying in the Mediterranean Sea offshore of Alexandria with the Lay barge Saipem 3000
	Installation of one-off Platform denominated Tea Jacket- for extraction gas on Adriatic Sea- Italian-water -INA AGIP
	Modernization of the Refinery in Loango field (Congo) to enslave at the new Colombian oil well, by amplifying and increase of the safety facilities, and rebuilding the harbour.
	Realization of one pipeline for to connect the Platform Tea and Amelia with the relative spool and riser in Adriatic Sea on behalf of AGIP-S.p.A.
	Realization of one-off Water Injection Pipeline 20” for overall length 5.5 Km between Platforms Booster 36 and Morgan 1 Terminal Platform on behalf of G.U.P.C.O. in Suez-Egypt
	Realization of one off Interfield Oil Pipeline 16” for overall 5.5 Km Between Platform Booster 36 Morgan 1Drilling Platform per on behalf of G.U.P.C.O. in Suez- Egypt
	Realization of two off pipeline –DOLPHIN PROJECT- 48”-36” for the connection of the Ras Laffam oil refinery to the nine central Cluster of Dubai for overall km.237.45
	Realization of one-off Water Pipe 40” Sub Sea for supply and rebuilt Waterworks Sierra De Tramontane’s in Mallorca Baleares for Overall km 76,800 Port Sollers – Sa Costera
	Realization of two off Pipeline on the North Sea on behalf of BP for the connection’s Platform Buzzard with Central and Southern Cluster Water Injection with relative Spool and Raiser
	Realization of the Rhum Field Development16”/22” oil pipeline on behalf of BP. for overall km 43,786
	Realization of one-off oil Pipeline 20” for overall 178.5 Km in Norway field Varyeth on behalf of STAT-OIL Company   
	Realization of two off oil Pipeline 20”/14” for overall 71.5 Km in England on behalf of CO.NO.CO. Phillips.
Site manager
Todini Costruzioni Generali-ToTo spa
giu 1997 - gen 2004
Construction of a High-Capacity Rail TAV, European Corridor 
N°5 Railroad track "Torino-Milano
In association with Main Contractor -Impregilo and Condotte SPA- in Consortium (Cav. To .MI) For the construction of a High-Capacity Railway Line TAV, European Corridor No. 5 Railroad track "Torino-Milano", from KP 25.00 to KP 33,00 shipyard in Livorno Ferraris.
The work also consisted of eleven (11) viaducts and eight (8) subways for ordinary roads. In addition to the initial project it has been realized the railway junction in the municipality of Cigliano, and hydraulic works generally.
The project consisted of rehabilitation and drainage in the industrial area of Vercelli. The total length of the 'intervention on the channels was about 48 km, and you proceeded to the installation of water pipes made of polyethylene 20 "for a total of 16 km, topographic new altimetry survey and final leveling of the soil.

Realization of the (Variante di Valico Lotto 3) Yard of Marzabotto-Querce.
Implementation of a series of measures to modernize the current motorway layout A1 Milano – Napoli. The main operations were concentrated in the construction of Tunnels and Viaducts, and the relative enlargement to three lanes in each direction for a total length of 7,200 km. Complementary works of arrangement hydraulic and road subway have completed the project.

Realization of the new Chisinau Water System Municipal Capital of the Republic of Moldova on behalf of SA APA CANAL: realization of the new main pipeline, with different kinds of pipes, valves and diameters, Steel \ Cast Iron and Polyethylene 16 "-24" -48 "for a total length of 126 km, with some parts in cross rivers, which required a special coating provided by Uponor S.A.
Redevelopment of two electrical substations and one water tanks lt.10.000

Todini Algeria Branch-Costantine 
Highway Ain-el.bej Ain Smara East-West (Constantine) Algerie
The project in co-operation with S.C.I. and the Algerian Cosider SA. consisted in the construction of the motorway Lot 1 ° EAST-WEST Constantine, stretch-Ain El Bey - Ain Smara, and particularly in the construction of the main works of art, viaducts, underpasses, retaining walls. Hydraulic and testing works have completed the project.
Assistant supervisor/site manager
S.I.I. (Soc.Imp.Indust.) - R.D.S.
nov 1983 - apr 1997
Realization of the Third Laneway of the Grande Raccordo Anulare (GRA) Rome, stroke- (Ponte Galeria-Tevere): construction of the Third Lane of the Great Ring Road (GRA) of Rome, Section - (Tiber-Ponte Galeria) from Kp 59 + 768 to Kp. 62 + 510 on behalf of the Soc. GEPCO-Anas. Construction of underpasses to ensure the ordinary road network and access to the GRA by means of a roundabout and its entrance and exit ramps, of a viaduct to cross the Tiber river, with two spans in iron provided by Soc. Omba Spa, with particular attention to the foundation cast in situ into the river bed, widening to three lanes in each direction for a total length of 2,742 km and the final arrangement of the embankments.

Refurbishment of the Palazzo Valentini seat of Rome's prov: technical adaptation of the electrical, water / sanitary and 'air-conditioning, the reconstruction of the terraces with the replacement of the floor and the renovation of the exterior and interior plaster for floors 1 and 3, the total replacement of fixtures and descendants of rainwater.

Complete Recovery and restoration of one Palace of XIV Century owned by industries Tacconi located in Tordibetto- Assisi: adapting the structures to earthquake standards, it proceeded to the restoration and to the strengthening of damaged walls and floors with special use mains welded by the method of " Sewing and Undoing "; Complete reconstruction of the roof with wooden trusses, and complete with local tiles, upgrading all facilities, final settlement of the gardens.
Construction of four electrical substations: redevelopment of two electrical substations disused site in Marginone power plant (Lucca) in order to adapt to the increased load of electrical conduction and construction of two complete substations operating in Eastern Rome Nucleus, called Testa di Lepre.

Construction of a complex for Offices: realization of the services, parks and streets of controlled access.
The project was carried out on behalf of the soc. SIAC. (Soc.Ita.Cred.Ass.S.p.A.).

Construction of Centre I.R.B.M. in Pomezia (ROME): construction of the research center with the adjustment axis road Pontina and of 'outdoor area accommodation.
Committed by Pharmacology House -Sigma-Tau (Group Merck).

Extension and construction of the Third Laneway in the classes A of the highway Milano-Napoli Dockyard N°9 from the Kp.125+680 to the Kp. 132+254: construction of viaducts, in the construction of a great channel for the disposal of water of the river Sele in the southbound carriageway A1 protection and its extension to three lanes in each direction throughout the total length. Completed the project to build a Piezometer of 15,000 liters that any final settlement of the minor works by restoring the ordinary roads with underpasses. Committed by Autostrade Spa.

Construction of 5 laboratories and relatives lodgings for the students of the University of Marsa El Brega (LIBYA) Committed by Azzaiwiya Oil Refining Company.

Collaboration in the preparation of designs for the recovery plan of the old town of Monterotondo (RM), study of the of rainwater drainage system and waste water from the Orsini Palace seat of the Municipality

Collaboration in the preparation of the plan of the city development of Mentana (RM), engineering of the areas to be used as car parks, the study of the water drainage system for the new school under construction.
Formazione
Geometra
Ist.Tecnico R.Lambruschini
set 1977 - lug 1982

          
        
Lingue
Inglese - B2
Francese - B1
Rumeno - B1
Informazioni addizionali
Descrizione tecnica
After completing studies, I began working in the field of civil construction gaining different experiences with contractor international level, such as: Civil and Industrial Construction-Oil and Gas and Power Plant.
The task assigned over the years, as set forth below in this cv have led me to the current position.